Deviation during cxecution of works : Rule 26 of the KMC Bldg, Rules 2009 reads us follows, rule 26 (2) (a) of the KMC Bldg. Rules. 2009 do not require sanction at every stage of such changes and at the end of the construction, all the deviations as stated in rule 26(2a) of the KMC Bldg. Rules, 2009 are to be incorporated in the Completion Plan
Deviation during cxecution of works : Rule 26 of the KMC Bldg, Rules 2009 reads us follows, rule 26 (2) (a) of the KMC Bldg. Rules. 2009 do not require sanction at every stage of such changes and at the end of the construction, all the deviations as stated in rule 26(2a) of the KMC Bldg. Rules, 2009 are to be incorporated in the Completion Plan
File Type:
pdf
Categories:
Circular, Office Circular
pm_enable_group_in_product_purchase:
0
site-sidebar-layout:
default
ast-site-content-layout:
default
site-content-style:
default
site-sidebar-style:
default
theme-transparent-header-meta:
default
astra-migrate-meta-layouts:
set
stick-header-meta:
default
astra_style_timestamp_css:
1750677878
